Second Presbyterian Church of Chicago
The project consisted of facilities renovations of a kitchen and bathroom on the second floor of the church.
Theo Ubique Cabaret Theatre
The City of Evanston needed to re-purpose an old retail space into a state of the art cabaret theatre…
1st Presbyterian Church Renewal
The First Renewal project at The First Presbyterian Church of Libertyville is the renovation of their 1929 Social Hall building.
Daley Lobby Ribbon
Structures Construction completed an interior renovation of the Richard J. Daley main campus lobby with custom architectural design features including laminated steel ribbons…
Exhale Yoga
We love the work Structures Construction did with our Exhale facility. Their work was quality and on time and they are so very easy to work with.
Oakley Lofts
Conversion of a two story warehouse building into a four story, 26 unit mixed use facility.Work included foundation strengthening, new heavy timber framing…
Ford Heights Community Center
Since 1968 the FHCSO has assisted countless of individuals and families in need. In 2012 the FHCSO along with IFF chose Structures Construction to add a 5000 s.f.
Deerpath Middle School
Renovation of school offices including; MEP systems, which were tied seamlessly into existing controls and fire alarm systems, plus…
Daley Solar
The Richard J. Daley Chicago City College wanted to take advantage of a large sunny flat roof and also create a working classroom environment for its students.
RSRC Calibrate Office
Structures Construction converted a vacant tenant space into a modern office environment. This tenant space is inside a loft style luxury apartment complex…
Children's Place
Expansion of unique child care services to meet the growing needs of the community. With the relocation of the half dozen offices we wanted to transform our existing space into two additional classrooms and a shared bathroom.
Dorchester
Structures, along with Landon Bone Baker, was such great partner. Because I'm an artist and work with my own team of designers…
Eastwood
The lobby, office and daycare needed updating, but we were worried about how to manage the process…
Glantz Design Studio
Structures Construction transformed a storage area on the third floor to a modern office space. Design features include: polished concrete floors…
Ascension of Our Lord
In the final stages of design, Structures Construction was retained by the Ascension of Our Lord Church to finalize design options, evaluate GC bids and oversee the project on the Church's behalf, including…
Halsted Timber Lofts
Construction of a mixed use mid-rise condominium building with retail and indoor parking at the base level on a sloping site in the South Loop.
Wright College Math Emporium
The City Colleges of Chicago needed a Math Lab for Wright College. The project was named Wright College Math Emporium and was made into a comfortable lab…
Verizon Hickory Hills
Construction of a 1,200 square foot addition at one of Verizon’s main communication facilities. Work included excavation around “live” fiber optic lines…
Lake Bluff Metra Station
The Lake Bluff Train Station, a historic masonry building located along the Union Paci c Railroad Line recently retained Structures Construction to complete an extensive renovation…
Truman College Gym
Truman College’s gym required upgrades to meet the growing needs of the Basketball and Volleyball teams. The renovation occurred over two summers…
Halsted Place
Structures Construction was brought in to deliver renovated apartments with an extremely tight schedule.
Riverdale
We were asked to take on a project that required the complete renovation of two buildings comprised of 24 residential units including new roof, windows, concrete balconies…
999 Oak Creek Drive
Interior renovation of existing offices and build-out for Business Only Broadband.
AT&T - 1819 W Division
Structures Construction converted an existing ground level commercial space inside a luxury loft apartment complex.
St. Andrews Greek Orthodox Church
The project consist of renovations to the chapel adjacent to the main church.
Daley Auditorium
Build out lower level of Building 700 at Daley College for ADA access with new flooring